- 30043856
- Apr 27, 2021
- 1 min read
Updated: Jun 10, 2021
Tuesday 20th April
Today i went into college to watch the Level 2’s Grease rehearsals. I was with Molly and Ava who also watched the rehearsals. From the previous production notes i needed to get the actors measurements so Ava could begin preparing their costumes. We took each actor out one by one and i wrote down the measurements to send to Ava. I also made rehearsal notes of anything Jo needed, the next production meeting is on the Thursday 29th.
Thursday 22nd April
Today, i was asked to work in the theatre to do some light rigging. This was because it was something i wanted more experience in. In the morning i did various jobs such as attaching clamps to the lights, climbing up the ladder to attach wires and going up the tower to adjust lights. I learnt a lot about dmx cables and how they work, i had the job of arranging each LED lights mode and dmx/ adress numbers. I really got the hang of this and i really enjoyed it.
Later on in the day i helped Molly in the Workshop, she was making set for Grease. She made the car which turned out really good and she needed my help to attach the wheels. During this, we ran into some problems, one of which was that the car couldn’t stand up on its own so as a team we came up with a solution. A clever idea was suggested about making a T stand at the bottom of the car. I am looking forward to what it will look like when it’s finished.