WEEK 23 (Final project)
- 30043856
- May 18, 2021
- 2 min read
Updated: Jun 10, 2021
Tuesday 4th May
Today was the last week of rehearsals in preparation for the Grease show next Wednesday. In the morning I sat and watched the Level 2’s perform and took notes of any key information I needed to. I was told the show dates and times which I wrote down and later let the production team know. I reflected on the lists I had made to ensure I was prepared for next week.I also made a final list for set, props and costume as there were a few more items needed for the show. In the afternoon we had a costume run, however we struggled as parts of the team weren’t able to make it in. We made use of who we had to help and did the best we could. We came across problems such as missing costume items and a lack of props. To solve this, it took note of everything and made a further list of items that were missing and its that needed to be prepared. The run through could of gone smoother if we had more of the tea to help, however it was only a rough costume run so me and Jo could get a feel of what to expect. This costume run really prepared everyone to put in their maximum effort to ensure a smooth show next Wednesday. Wednesday 5th May Today was the day to prepare any final costume and props for the show. I helped Molly finish the Grease lightning car and gather any final props. Today the production team worked really hard to get together as much they could for the show. An issue we faced was props we couldn’t find at college, however me and Molly came together to make some props such as the Mac n Cheese pasta bowl. Thursday 6th May
Today the production team and i checked our lists and got together anything we didn’t have. Again, we worked quickly and hard to get jobs done such as finishing the wall, making signs for set, and much more. Today was a very busy day but we had to get everything finished before the show next week.
Comments